Hi Hin, La Bua Villas

June 11, 2018

Hi Hin, Banyan Golf Club

June 11, 2018

Hua Hin, Banyan Villas

Banyan – Kunini has worked in both the Resort and the Private Villas carrying out a variety of electrical works from installing RCBO protection and a […]
June 11, 2018

Hua Hin, Sira Sila Villas

Sira Sila – Kunini has installed the complete Electrical System for two Villas at the Sira Sila project. One Villa was a simple Electrica […]
June 11, 2018

Hua Hin, Private Villa, Palm H …

A private villa in Palm Hills, Kunini was contracted to install the electrical system for the main villa. A complete system from design to […]
June 11, 2018

Koh Samui, Waterfall Villa

Waterfall Villa – a private luxury villa, Kunini installed a Futronix Lighting Control System for the main areas. A unique villa with a wa […]
June 11, 2018

Koh Samui, Beach Republic

Kunini installed a Futronix Lighting Control System for the Beach Club, Futronix is a multi zone mood lighting system. Kunini was responsibl […]
June 11, 2018

Hua Hin, Black Mountain Projec …

Black Mountain Villas – Kunini was the main electrical contractor for the initial few villas both Hole 4 and Par3 Villas. A complete Turn […]
June 11, 2018

Koh Samui, Baan Rak Talay

Baan Rak Talay – re branded as Panacea Villas, Kunini was contracted for the entire electrical contract, from main incoming power, in […]