Black Mountain Villas – Kunini was the main electrical contractor for the initial few villas both Hole 4 and Par3 Villas. A complete Turn-Key electrical system was installed from initial Electrical design thru to final installation and on going maintenance. These villas were fitted with LED lighting throughout with standard dimming in some rooms, Panasonic switches, sockets and TV points and a cabled Cat6 network backbone was installed allowing for internet access on TV’s in all rooms. Some owners opted to install A-Touch Automation for lighting and Surge and Lighting Protection to give added peace of mind..